(OUR STORIES)
Bright Programme
A BRIGHTER MODEL FOR ENERGY EFFICIENCY
(overview)
A BRIGHTER MODEL FOR ENERGY EFFICIENCY
Created in 2013, the Bright® Programme is an ongoing endeavor that targets to identify and imple-ment key energy efficiency actions at Sierra's assets and as a service for clients. It has already been responsible for a downsize of over 32,200 MWh in Sierra's operational energy consumption, as well as in other relevant performance indicators.
In 2022, Sierra launched Bright 2.0. A profound redesign of the programme to include cutting-edge technologies and expand capacities. The renewed edition has been extended and is implemented for most of Sierra's investment properties portfolio, including specialized audits and performance monitor-ing initiatives, with updated technical standards based on the Best Available Technologies.
By the end of 2023, 31 measures were implemented, rendering 3% of energy potential savings vs the 2019 baseline, out of the total 33% energy potential savings identified in 150 measures. This equates to €902k in consumption savings implemented vs a total of €6.5m of all measures or 44.5 GWh.
2023 WHERE WE ARE
Bright: 273 initiatives implemented, wich generated 703 improvement opportunities
Bright: 32,200 MWh and €7.4 million in potential yearly savings
Bright 2.0: 150 improvement opportunities identified (reached 33% potential for energy efficiency based on half of the initiatives rollout)
Bright 2.0: 44,5 GWh and €6,5 million in potential yearly savings